Algebrahard · Past Paper

A and B can do a piece of work in 12 days, B and C in 15 days, and C and A in 20 days. How long would A take to do the work alone?

A30 days
B20 days
C24 days
D40 days

✓ Correct Answer: A30 days

1/A+1/B=1/12, 1/B+1/C=1/15, 1/C+1/A=1/20. Adding gives 2(1/A+1/B+1/C)=1/5, so 1/A+1/B+1/C=1/10. 1/A = 1/10 - 1/15 = 1/30. So A takes 30 days.

Share this question

More from Algebra